Paver terrace and walkway built by Lawn 'N' Order in Winnipeg

Hardscape · Winnipeg

The surface everything else is built around.

Paver patios, natural stone, walkways and driveway extensions — set on a base excavated and compacted for Red River clay, so the surface you paid for is still flat after a decade of freeze-thaw.

3–5 daysTypical residential patio
2× baseIndustry-standard depth
Zone 3bMaterials rated for -40 °C
CMHACertified hardscape crew

Nobody in Winnipeg replaces a patio because they got bored of the stone. They replace it because it moved.

Our clay soil swells and shrinks, the frost line sits around four feet down, and every winter drives water in and out of whatever sits above it. A patio built on a thin base will read beautifully in photos for two seasons and then start telling on itself — a dip at the door, a step out of level, joints opening up, a walkway that sheds water toward the foundation instead of away from it.

So we build the part you never see twice as heavy as the industry standard asks: proper excavation, granular base placed in compacted lifts, compaction tested before any stone goes down, edge restraint on every edge, and grades set so water leaves. Then the finish — Barkman, Belgard, Techo-Bloc and natural stone laid out to a drawing, tied into steps, walls, planting and lighting so the terrace reads as part of the house rather than a slab in the lawn.

We have been doing exactly this in this city since 1993, and we still maintain patios we built two decades ago.

What we build

Patios, walkways, driveways — and how they connect.

Hardscape is circulation before it is surface. Where people walk, sit, cook and park decides the shape long before the stone is chosen.

Multi-level interlocking paver patio in Tuxedo, Winnipeg

Paver patios

Interlocking pavers from Barkman, Belgard and Techo-Bloc, sized around real furniture rather than a rectangle. Dining needs clearance behind chairs, lounge seating needs a different depth, and a patio serving both usually wants two levels instead of one big field of stone.

  • Laid out on the drawing with furniture footprints
  • Level changes used to separate zones
  • Pitched away from the house, every time
Natural stone patio at Riverside Retreat in Winnipeg

Natural stone patios

Flagstone, limestone and granite in irregular or sawn layouts, for a terrace that never looks like a catalogue page. Each piece is set on the same engineered base as our pavers, so natural stone stays just as flat.

  • Flagstone, limestone and granite
  • Irregular or sawn-edge layouts
  • Same double-depth base as pavers
Paver walkway connecting outdoor spaces at Riverside Retreat

Walkways & pathways

The front walk is the one piece of landscape every visitor uses, and back-yard paths decide how the whole yard gets used. Width, banding and step rhythm are what make a walkway read as designed instead of patched.

  • Generous width — two people, side by side
  • Steps and landings on consistent risers
  • Lighting sleeves run before the stone goes down
Interlocking paver driveway extension in Winnipeg

Driveway extensions

Widen the driveway or add a parking pad in pavers that carry vehicle loads. A driveway takes far more weight than a patio, so the base goes deeper again and the edges are restrained to stop the field creeping under tires.

  • Vehicle-rated pavers and deeper base
  • Edge restraint on every free edge
  • Tied into the front walk so it reads as one surface
Pavers or poured? Read interlocking vs concrete for Winnipeg driveways.

Below the stone

Six things that decide whether a patio stays flat.

Every one of these is invisible the day we finish, and every one of them is why a Lawn ‘N’ Order quote is not the cheapest quote you will get.

01

Excavation depth

Dug to a depth set by clay and frost, with the subgrade proof-rolled before anything is placed back in.

02

Granular base in lifts

Base built up in measured lifts and compacted each time — double the depth most installers quote in this city.

03

Compaction testing

Compaction is verified, not assumed, before a single paver is set.

04

Pitch & drainage

Surfaces pitched away from the house at a grade you can’t feel underfoot but water can.

05

Edge restraint

Every free edge restrained so the field stays tight instead of spreading and opening joints.

06

Jointing & finish

Joint material appropriate to the stone and use, so weeds and washout aren’t next summer’s project.

Same yard

From open base to a terrace you live on.

Finished: completed multi-level paver terrace with planting and lighting in Tuxedo
Mid-build: the same terrace during construction
Mid-build Finished

The Harvest Build, Tuxedo — mid-build and finished. Drag the handle.

Photo needed — a real “before” shotOne wide photo of a yard taken from the back door BEFORE any work, plus the finished photo from the exact same position and height on the same project. This pair is the single highest-converting image a landscaper can own — worth shooting deliberately on the next three builds.

Materials

What the surface can be

Chosen at the design stage against the house, not off a rack on install day. Samples come to the site visit.

Swatch — smooth modern paverFlat overhead shot, dry.

Smooth modern pavers

Large-format, tight joints, quiet colour. Reads architectural next to a newer build.

Swatch — tumbled / texturedFlat overhead shot, dry.

Tumbled & textured

Softer edges and warmer tone. Forgiving on older houses and mature yards.

Swatch — natural stoneFlat overhead shot, dry.

Natural stone

Flagstone and slab in irregular or sawn layouts, for a terrace that never looks catalogue.

Swatch — permeable systemFlat overhead shot, dry.

Permeable systems

Where runoff has nowhere to go, the surface itself takes the water down into an open base.

Patios are booked by the season, not the week.

Tell us the space and how you want to use it. We’ll walk the property, talk grades and materials, and give you a written scope.

How it goes

Four steps, no surprises

1

Site visit

We walk the yard, take levels, talk about how you want to use the space, and bring material samples.

About 45 minutes
2

Layout & written scope

A drawn layout with dimensions, materials, base spec and grading — plus a fixed scope so the quote is comparable line for line.

1–3 weeks
3

Build week

Excavation, base, compaction testing, laying, edge restraint and jointing — with the site cleaned at the end of each day.

3–5 days typical
4

Walkthrough & aftercare we stay reachable

We go over settling, joint sand, sealing if it applies, and what our care team handles if you want it looked after.

Ongoing · optional

Word of mouth

Winnipeg homeowners on the hardscape

★★★★★
“The team designed and built our patio last summer. It survived the harsh winter perfectly. Their expertise in Manitoba’s climate really shows.”
K
Kristen M.St. Vital
G
★★★★★
“Lawn ‘N’ Order transformed our backyard into an amazing outdoor living space. Their attention to detail and professionalism is unmatched. Worth every penny!”
K
Kim R.Tuxedo
G
★★★★★
“We’ve used them for 5 years for snow removal and lawn maintenance. Always reliable, always professional. Best landscaping company in Winnipeg!”
H
Heather D.River Heights
G
4.7 / 5 from 250+ Google reviews

Patio questions

The five we’re asked every spring

How long does a patio take to build?

Most residential patios take 3–5 days. Larger or more complex projects — steps, sitting walls, multiple levels — run 1–2 weeks. You get the schedule in writing before we mobilise, and the site is left tidy each evening.

Will my pavers heave in a Manitoba winter?

Heaving is a base failure, not a paver failure. We excavate to depth for Red River clay, build the granular base in compacted lifts, test compaction before laying, and restrain every edge. That is what keeps a surface level through freeze-thaw — and it is why our base spec is roughly double what is commonly quoted here.

Pavers or poured concrete?

Pavers, for this climate. They flex with ground movement, and individual units can be lifted and reset if anything ever needs attention. Poured concrete cracks on clay and has to be cut out to repair.

Do I need to seal it?

Optional. Sealing deepens colour and helps resist stains on an entertaining surface, and is normally redone every few years. We’ll tell you plainly whether your stone benefits from it rather than selling it by default.

Can you repair a patio another company built?

When it’s part of a larger design-build project, yes. Isolated repairs on someone else’s install usually aren’t a fit for our crews, and we’ll say so at the first conversation instead of wasting your time.

Ballpark before you book?

The cost calculator gives an instant range for patios, walkways and 14 other services. Useful for sanity-checking scope before a site visit.

Open the cost calculator

Ranges only — the firm number comes after we’ve seen the grades.

Screenshot needed — calculator UISame asset as the other service pages: one clean shot with a range visible.

Usually built with

Flat in ten years, not two.

Let’s talk about the surface.

Send us the yard and what you want to do on it. We’ll come look at the grades and tell you what it takes.